University of North Carolina Wilmington School of Nursing Commissioning Wilmington, NC Project Details Harrell Design Group, PC was the Commissioning Agent for the new three-story, 80,000 square foot School of Nursing classroom and laboratory building. The scope includes commissioning the building mechanical, electrical and specialty systems [...]
University of North Carolina Wilmington – Residence Hall Fire Sprinkler Renovation – Wilmington, NC
ccpAdmin2020-02-12T16:14:20+00:00University of North Carolina Wilmington Residence Hall Fire Sprinkler Renovation Wilmington, NC Project Details Harrell Design Group provided complete mechanical, electrical, plumbing and fire protection design as well as complete building commissioning. This project consisted of fire protection, data and ceiling renovation of two four-story residence [...]
Guilford Technical Community College – New Classroom Building at the High Point Campus – High Point, NC
ccpAdmin2020-02-12T16:24:34+00:00Guilford Technical Community College New Classroom Building at the High Point Campus High Point, NC Project Details The project consists of a 37,800 sf, three-story general classroom building on the Guilford Technical Community College, High Point Campus. The project will provide 16 general classrooms, 2 Physical [...]
Appalachian State University – East Campus Chiller Facility – Boone, NC
ccpAdmin2020-02-12T16:38:04+00:00Appalachian State University East Campus Chiller Facility Boone, NC Project Details Harrell Design Group, PC provided the design of the East Campus Chiller Facility at Appalachian State University. The scope of work consisted of calculating the cooling loads of three existing campus buildings and studying the [...]
Appalachian State University – Panhellenic Hall Renovation – Boone, NC
ccpAdmin2020-02-12T16:33:04+00:00Appalachian State University Panhellenic Hall Renovation Boone, NC Project Details Harrell Design Group, PC provided analysis and design for the renovation of HVAC, fire protection, alarm, electrical, and IT systems throughout the building. Existing rooftop HVAC equipment was replaced and a new system was designed to [...]